Selected references and currently running projects of Provyko

Scope

Level

Customer

Year

Reconstruction of OFA air K4, EMĚ I

Design, delivery, commissioning

Energotrans, a.s.

2019-2020

Reconstruction of coal burners on the K6 boiler in the Trmice Heating Plant, ČEZ a.s.

Design, delivery, commissioning

ČEZ a.s.

2019-2020

Reduction of emissions at the K1 boiler in Synthos Kralupy, a.s.

Design, delivery, commissioning

Synthos Kralupy, a.s.

2019

Reduction of NOx emissions on the steam boiler BA-110 in SLOVNAFT, a.s.

Design, delivery, commissioning

SLOVNAFT, a.s.

2019-2020

Optimizing of Boiler K1,K2,K3 Mělník I (Primary Measures  - Burners, Air and Recirculation Ducts)

Design, commissioning

MARTIA a.s.

2018

Optimizing of Boiler K3, K4

Chvaletice

Design, delivery, commissioning

7EC Chvaletice

2017-2018

Optimizing of Boiler K5,K6, Mělník I (Primary Measures  - Burners, Air and Recirculation Ducts)

Design, commissioning

MARTIA a.s.

2017

Optimizing of Boiler K4, Mělník I (Primary Measures  - Burners, Air and Recirculation Ducts)

Design, commissioning

MARTIA a.s.

2016

Denitrification of boiler K3, Synthos (Primary Measures – Gas Burners)

Design, delivery, commissioning

TAMERO Invest a.s.

2016

Gasification of Boiler K10, Mondi (Delivery of  Flue Gas Recirculation piping)

Design, delivery, commissioning

PBS PE s.r.o. / MONDI Štětí a.s.

2016

Reconstruction of the Boiler K2,K4, DeNOx - Primary Measures

Design, delivery, commissioning

AmpluServis, a.s./ Veolia Energie, a.s.

2015-2016

Ring Mill-3pcs (13t/h)

Design, delivery, commissioning

Energyco, s.r.o. /

2013-2015

High Pressure Heater-1 pc (240m2)

Design, delivery

Energyco, s.r.o. /

2013-2015

Reconstruction of the Boiler K1 to reduce emissions NOx

Design, delivery of OFA system, commissioning

SP Power s.r.o. /
Plzeňská energetika a.s.

2015

Modification of Milling system-Clasifiers (Boiler K1 and K2)

Design, delivery

SES Tlmače, a.s. /
Slovenské elektrárne, a.s.

2015

1 pcs Low Pressure Heater (92m2)

Design, delivery

Siemens, s.r.o.

2014-2015

2 pcs Low Pressure Heater (250m2, 210m2)

Design, delivery

Siemens, s.r.o.

2014-2015

DeNOx of Boiler PK4S (Košice)-Combustion system

Design, delivery, commissioning

Energyco, s.r.o. / TEKO, a.s.

2014-2015

Boiler K7

Design, delivery, commissioning

Energyco, s.r.o. /
U.S . Steel Košice, s.r.o.

2013 -2016

Denitrifikcation PK4N v TEKO

Concept, Basic and Detail Design

Energyco, s.r.o. / TEKO, a.s.

2014

DeNOx of Boiler K4 (Plzeň)-Combustion system

Design, delivery, commissioning

SP Power s.r.o. /
Plzeňská teplárenská, a.s.

2014

DeNOx of Boiler K1, K2 and K5 (Žilina)-Classifiers (12 pcs)

Design, delivery, commissioning

SES Tlmače, a.s. /
Žilinská teplárenská, a.s.

2014-2015

DeNOx of Boiler K14 (Třebovice)-Milling system

Design, delivery, commissioning

SES Tlmače, a.s. / Dalkia, a.s.

2014 -2015

DeNOx of Boiler K3 and K4-Economizer

Design, delivery

Vítkovice PE a.s. / ČEZ a.s.

2013-2015

DeNOx of Boiler K3

Design, delivery, commissioning

MPS Mont, a.s. /
Dalkia Industry, a.s.

2013-2014

2 pcs Low Pressure Heater (40m2)

Detail design, delivery

Siemens, s.r.o.

2013

Pulverized coal burners for boiler 180 t/h

Design, delivery, commissioning

SP Power s.r.o. /
Plzeňská energetika a.s.

2012-2013

Start-up and stabilization burners for boiler 180 t/h

Design, delivery, erection, commiss

Plzeňská energetika a.s.

2012-2013

Cooler (16m2)

Detail design, delivery

DOOSAN Škoda

2013-2013

Vent steam condenser (10m2)

Detail design, delivery

DOOSAN Škoda

2012-2013

Repair of CFB boiler evaporator

Design, delivery, erection

Plzeňská teplárenská, a.s.

2012

Coal mill classifiers for boiler 180 t/h

Design

SP Power s.r.o. /
Plzeňská energetika a.s.

2012-2013

Coal mill classifiers for boiler 185 t/h

Design

SP Power s.r.o. /
Plzeňská teplárenská, a.s.

2012

Gas burner spare parts for boiler 50 t/h

Delivery

ENEZA, a.s. / Dalkia a.s.

2012

Conversion of coal boiler 210 t/h to gas firing

Design, delivery, commissioning

Energyco, s.r.o. /
TEKO, a.s.

2011-2013

Denitrifications of utility and industrial plants

Concepts, technical feasibility studies

ČEZ (2x), Dalkia (3x), Alpiq (4x), EoN (1x) and others

2011-2012