Boiler K1 denitrification, Pilsen

Implementation site: Plzeňská energetika, boiler K1
Implementation term: 2015

 Boiler, type Dry bottom boiler with natural circulation and four fan mills
 Boiler parameters
  • 185 t/h; 13.6 MPa(a); 540°C 
  • Brown coal
 Scope of delivery
  • Technical design of boiler reconstruction
  • Documentation 
  • Combustion system (coal burners and pulverized fuel ducts, OFA air systems)
  • Modification of the mechanical part for SNCR
  • Assembly supervision
  • Commissioning

 Guaranteed emissions

  • NOx < 290  mg/Nm3 (partial < 240 mg/Nm3)
  • COx < 100 mg/Nm3
 Milestones
  • Start: 3/2015
  • End: 10/2015
 Boiler, type Dry bottom boiler with natural circulation and four fan mills
 Boiler parameters
  • 185 t/h; 13.6 MPa(a); 540°C 
  • Brown coal
 Scope of delivery
  • Technical design of boiler reconstruction
  • Documentation 
  • Combustion system (coal burners and pulverized fuel ducts, OFA air systems)
  • Modification of the mechanical part for SNCR
  • Assembly supervision
  • Commissioning

 Guaranteed emissions

  • NOx < 290  mg/Nm3 (partial < 240 mg/Nm3)
  • COx < 100 mg/Nm3
 Milestones
  • Start: 3/2015
  • End: 10/2015