Implementation site: Power Plant Počerady, for the company Sev.en Engineering s.r.o.
Implementation term: 2023/2025
|
|
The pressure boiler B3 - PG 640 with a nominal output of 640 t/h is intended for a 200 MW energy unit for burning brown coal. |
|
|
• 640 t/h; 17.5 MPa(a); 540°C • Brown coal |
|
|
• Design of a technical solution evaporator, EKO, LUVO, hopper intermediate frame (water seal), powder burners and burner boxes MO 21 to MO 28, fuel and ash hoppers, slag ejectors VS 21 and VS 22, slag crushers, PK13, chambers, steam superheater V, intermediate heater 2 ( MP II), powder pipelines, control flaps • Assembly and assembly supervision |
|
|
|
|
|
|
|
|
The pressure boiler B3 - PG 640 with a nominal output of 640 t/h is intended for a 200 MW energy unit for burning brown coal. |
|
|
• 640 t/h; 17.5 MPa(a); 540°C • Brown coal |
|
|
• Design of a technical solution evaporator, EKO, LUVO, hopper intermediate frame (water seal), powder burners and burner boxes MO 21 to MO 28, fuel and ash hoppers, slag ejectors VS 21 and VS 22, slag crushers, PK13, chambers, steam superheater V, intermediate heater 2 ( MP II), powder pipelines, control flaps • Assembly and assembly supervision |
|
|
|
|
|
|