Greening of the K4 boiler by co-combustion of natural gas

Implementation site: TAMEH Czech s.r.o. – Ostrava, Boiler K4
Implementation term: 2022/2023

 Boiler, type

Single-drum steam boiler, two-pass with BFG and COG combustion (6 pcs gas burners)

 Boiler parameters

  • 80 t/h; 9,6 MPa(a); 520 °C
  • Blast-furnace Gas, Coke-oven Gas and Natural Gas

 Scope of delivery

  • Design of a technical solution
  • Processing of project documentation
  • Supply of technology: 6pcs gas burners, inlet pipeline of NG, parts of inlet pipeline BFG and COG, hot air duct, flue gas recirculation duct incl. fan, auxiliary steel structure, insulation, refractory and C&I and electro modification
  • Disassembly and Assembly of technology
  • Commissioning

 Guaranteed parameters

  • NOx < 100 mg/Nm3  
  • CO < 100 mg/Nm3

 Milestones

  • NTP: 05/2022
  • PAC: 02/2023

 Boiler, type

Single-drum steam boiler, two-pass with BFG and COG combustion (6 pcs gas burners)

 Boiler parameters

  • 80 t/h; 9,6 MPa(a); 520 °C
  • Blast-furnace Gas, Coke-oven Gas and Natural Gas

 Scope of delivery

  • Design of a technical solution
  • Processing of project documentation
  • Supply of technology: 6pcs gas burners, inlet pipeline of NG, parts of inlet pipeline BFG and COG, hot air duct, flue gas recirculation duct incl. fan, auxiliary steel structure, insulation, refractory and C&I and electro modification
  • Disassembly and Assembly of technology
  • Commissioning

 Guaranteed parameters

  • NOx < 100 mg/Nm3  
  • CO < 100 mg/Nm3

 Milestones

  • NTP: 05/2022
  • PAC: 02/2023