Gas installation of the hot-water boiler with slag tap furnace, Košice

Implementation site: heating plant Košice, boiler HK3
Implementation term: 2019 – 2020

 Boiler, type Hot-water gas/coal wet bottom boiler with drum milling system 
 Boiler parameters
  • 20 – 116 MWt; 2.3 MPa(a)
  • Black coal/natural gas -> natural gas
 Scope of delivery
  • Technical design of boiler reconstruction
  • Documentation
  • Delivery of combustion and safety system 
  • Assembly supervision
  • Commissioning

 Guaranteed emissions

  • NOx < 100 mg/Nm3
  • COx < 100 mg/Nm3
 Milestones
  • Start: 2/2019
  • End: 1/2020
 Boiler, type Hot-water gas/coal wet bottom boiler with drum milling system 
 Boiler parameters
  • 20 – 116 MWt; 2.3 MPa(a)
  • Black coal/natural gas -> natural gas
 Scope of delivery
  • Technical design of boiler reconstruction
  • Documentation
  • Delivery of combustion and safety system 
  • Assembly supervision
  • Commissioning

 Guaranteed emissions

  • NOx < 100 mg/Nm3
  • COx < 100 mg/Nm3
 Milestones
  • Start: 2/2019
  • End: 1/2020