Modernization of ignition and stabilization burners K5 and K6 in ČEZ, a.s. Teplárna Trmice

Implementation site: ČEZ, a.s., Teplárna Trmice, Boiler K5, K6
Implementation term: 2023

 Boiler, type

The K5 and K6 steam boilers are water-tube with a granulation combustion chamber, two-stroke, burning brown coal. The existing fuel oil ignition and stabilization burners 4 pcs/boiler now burn natural gas.

 Boiler parameters

  • 145 t/h; 13,6 MPa(a); 535 °C +5/–10 °C
  • Lignite + new natural gas for ignition and stabilization burners

 Scope of delivery

  • Design of a technical solution
  • Processing of project documentation
  • Supply of technology, in particular: natural gas pipeline from control system to the boiler incl. the main gas shut-off, gas burners, electricity and  I&C  incl. detection, safety control system of burners
  • Assembly and assembly supervision
  • Adjustment of new technology and commissioning
  • Operator training

 Guaranteed parameters

  • NOx < 150 mg/Nm3
  • CO < 80 mg/Nm3

 Milestones

  • NTP: 01/2023
  • PAC: 11/2023

 Boiler, type

The K5 and K6 steam boilers are water-tube with a granulation combustion chamber, two-stroke, burning brown coal. The existing fuel oil ignition and stabilization burners 4 pcs/boiler now burn natural gas.

 Boiler parameters

  • 145 t/h; 13,6 MPa(a); 535 °C +5/–10 °C
  • Lignite + new natural gas for ignition and stabilization burners

 Scope of delivery

  • Design of a technical solution
  • Processing of project documentation
  • Supply of technology, in particular: natural gas pipeline from control system to the boiler incl. the main gas shut-off, gas burners, electricity and  I&C  incl. detection, safety control system of burners
  • Assembly and assembly supervision
  • Adjustment of new technology and commissioning
  • Operator training

 Guaranteed parameters

  • NOx < 150 mg/Nm3
  • CO < 80 mg/Nm3

 Milestones

  • NTP: 01/2023
  • PAC: 11/2023