Boiler K14 denitrification, Ostrava

Implementation site: power plant Třebovice, boiler K14
Implementation term: 2014 – 2015

 Boiler, type

Reconstruction of the wet bottom boiler to dry bottom

 Boiler parameters
  • 161 MWt; 220 t/h; 10.89 MPa; 535°C
  • Bituminous  coal
 Scope of delivery
  • Technical design of coal drying change
  • Documentation
  • Secondary steam fan
  • System of recirculation of warm and hot flue gases
  • Assembly supervision
  • Commissioning
 Milestones
  • Start: 3/2014
  • End: 11/2015
 Boiler, type

Reconstruction of the wet bottom boiler to dry bottom

 Boiler parameters
  • 161 MWt; 220 t/h; 10.89 MPa; 535°C
  • Bituminous  coal
 Scope of delivery
  • Technical design of coal drying change
  • Documentation
  • Secondary steam fan
  • System of recirculation of warm and hot flue gases
  • Assembly supervision
  • Commissioning
 Milestones
  • Start: 3/2014
  • End: 11/2015