Repair of Boiler B4, Počerady Power Plant

Implementation site: Elektrárna Počerady, a.s.
Implementation term: 2024/2025

 Boiler, type

The pressure boiler B2 - PG 640 with a nominal output of 640 t/h is intended for a 200 MW energy unit for burning brown coal.

 Boiler parameters

  • 640 t/h; 17.5 MPa(a); 540°C
  • Brown coal

 Scope of delivery

  • Technical solution design
  • Preparation of project, implementation, production and assembly  documentation
  • Supplies of technology for repair/replacement, in particular:
  • evaporator parts, ECO, Powder burners – replacement of nozzles and repair of cylindrical parts of transition pieces of burner boxes mill circuit 41 to 48
  • Assembly and assembly supervision
  • Work tests

 Milestones

  • NTP: 11/2024
  • PAC: 08/2025

 Boiler, type

The pressure boiler B2 - PG 640 with a nominal output of 640 t/h is intended for a 200 MW energy unit for burning brown coal.

 Boiler parameters

  • 640 t/h; 17.5 MPa(a); 540°C
  • Brown coal

 Scope of delivery

  • Technical solution design
  • Preparation of project, implementation, production and assembly  documentation
  • Supplies of technology for repair/replacement, in particular:
  • evaporator parts, ECO, Powder burners – replacement of nozzles and repair of cylindrical parts of transition pieces of burner boxes mill circuit 41 to 48
  • Assembly and assembly supervision
  • Work tests

 Milestones

  • NTP: 11/2024
  • PAC: 08/2025