Boiler K3, K4 denitrification, Dětmarovice

Implementation site: power plant Dětmarovice, boiler K3, and K4
Implementation term: 2013 – 2015

 Boiler, type Once-through dry bottom boiler with four ring mills
 Boiler parameters
  • 650 t/h; 17.46 MPa; 540°C
  • Bituminous coal, natural gas
 Scope of delivery
  • Technical solution of modification of the economizer to install SCR technology
  • Documentation
  • Economizer
  • Connecting piping
  • Assembly supervision
 Milestones
  • Start: 11/2013
  • End of K3: 2/2015
  • End of K4: 5/2015
 Boiler, type Once-through dry bottom boiler with four ring mills
 Boiler parameters
  • 650 t/h; 17.46 MPa; 540°C
  • Bituminous coal, natural gas
 Scope of delivery
  • Technical solution of modification of the economizer to install SCR technology
  • Documentation
  • Economizer
  • Connecting piping
  • Assembly supervision
 Milestones
  • Start: 11/2013
  • End of K3: 2/2015
  • End of K4: 5/2015