SCR Tail-End NOx Reduction in Trmice Plant

Implementation site: peaking heating plant Trmice (CZ)
Implementation term: 2019 - 2022

 Unit, type

Unit for NOx reduction from 6 boilers in Trmice plant
located behind the technology of desulphurization, flue gas
heating by steam using a steam heater.

 Unit parameters
  • Volume of the flue gas  ≤ 882 000 Nm3/h
  • Flue gas outlet temperature ≤ 82°C
 Scope of delivery
  • Design of technical solution, project doc.
  • Material supplies (SCR reactor, flue gas ducts, steam flue
    gas heater, steam connection incl. control station,
    condensate drain, catalyst, reagent dosing, storage and
    distribution, ID fan
  • Commissioning

 Guaranteed emissions

  • NOx ≤ 175 mg/Nm3
  • NH3 ≤ 3 mg/Nm3
 Milestones
  • Start: 11/2019
  • End: 03/2022
 Unit, type

Unit for NOx reduction from 6 boilers in Trmice plant
located behind the technology of desulphurization, flue gas
heating by steam using a steam heater.

 Unit parameters
  • Volume of the flue gas  ≤ 882 000 Nm3/h
  • Flue gas outlet temperature ≤ 82°C
 Scope of delivery
  • Design of technical solution, project doc.
  • Material supplies (SCR reactor, flue gas ducts, steam flue
    gas heater, steam connection incl. control station,
    condensate drain, catalyst, reagent dosing, storage and
    distribution, ID fan
  • Commissioning

 Guaranteed emissions

  • NOx ≤ 175 mg/Nm3
  • NH3 ≤ 3 mg/Nm3
 Milestones
  • Start: 11/2019
  • End: 03/2022